Lowerfield Farm

Monday, 26 March 2012

Building almost finished

New car park and frontage
Well, it's been a busy winter with all the action here at the B&B, but we are now almost at the end of the work. I can't believe I've left it so long since the initial updates.
We now have 2 extended rooms and one new room, all with lovely ensuites, and the construction is completed.
Completing the ensuite and decoration to the former dining room, and decoration of the stables to the new dining room is just about all that remains.
As I write various smaller matters - particularly to our private side of the house - are being squared away, and the decorators are putting the first coats
of paint to the walls of the new dining room. It's looking brilliant.
New bedroom (The Lynches)
We have also taken the opportunity to remodel the car park, moving it away from the new dining room windows and adding extra spaces, including one for disabled use.
I'll be posting more photos of the rooms on the website over the next few days, as well as some before and after photos here.

Thursday, 8 December 2011

Windy Thursday, shelterless pigs

Most of the UK has been buffeted by unusually strong winds today, and we've had our share here. Though nothing like the severe storm conditions further north (70-80mph in some towns and cities in Scotland, and 165mph on the top of Cairngorm), there's quite a bit of local damage such as overturned animal housing and damaged trees.
One of our heavy pig shelters has been migrating today and finally ended up in the neighbouring paddock, having been lifted clean over the stock fence. Therefore I opened up the fence between the two pig paddocks to let them all shelter together tonight; it'll be snug! It's the first time the boar has been in with the fattening pigs, so let's hope they get on OK. He's not trained to the electric fence yet so had already pranged his nose a couple of times before I'd come in tonight, rooting about to look for gaps in the fences.
For the bricklayers it's been a demanding one. They kept going through the day and are working on the over-window arches. They've made good progress on what can't have been a comfortable day up on the scaffolding. The heavens opened around dusk, but fortunately I think they had just about packed up by then.

Sunday, 4 December 2011

Building update - walls rising

Walls up to mid-window level - End of week 3
The project has really moved on again this week and it's almost hard to remember what it was like a week ago. The focus all through the week has very much been upon the walls, which are now up to head height and the internal walls have also been constructed to the same level. Weather's been pretty good again, just a bit windy early in the week, and some occasional showers. Can't complain for late November / early December. May the luck continue.
The plan is that the extension should be enclosed (i.e. a battened roof) by the time the builders break for Christmas / New Year, but that will largely depend upon whether the weather holds. Then once the roof proper is in place and the work has moved inside, we will be altogether less dependent upon what's happening with the elements.

For the week ahead: Work will continue with raising the walls and building above window height. The arches will need to be build over the windows and doors and hopefully the joists will go on late in the week.
Internal walls added

Sunday, 27 November 2011

Building Progress

Digging out floors
Well, the guys have really cracked on with the work this week and we've been fortunate that the weather's been good.
The floor area was excavated, pipework has been reset, the brickwork and blockwork has been built to the damp proof course level, and then on Friday the concrete floors were laid. Worryingly, it started to rain a little in the afternoon on Friday, but by yesterday morning it had cleared up and the concrete's drying well.
New Dining room (not completed!)
While the floor was still being dug out the bricklayers started work in the stables, removing dividing walls and digging up the existing floor. You can see in this picture that it's turning into an impressively sized room. While we were designing it I was wondering whether to go quite so long or retain slightly more for the stables themselves (Meredith & I still hope to have our own equines at some point in the future), but with incorporating the bar area in the dining room this will probably turn out to be a good size.
Walls to dpc
Concrete floors in - End of week 2

For the week ahead: we should see the walls shoot up a pace if the weather holds. One of the really exciting bits! I'm taking plenty of shots, as from past experience we know that a couple of months from now we'll have forgotten that it was ever different.

Friday, 25 November 2011

Japanese TV visit

At the start of this week we were hosts to a crew from Japanese Satellite TV channel Fuji BS, and had a great time with them here.
With Yuko and Yumi as they were leaving
They were making a programme where two well-known lady presenters on Fuji TV, Yumi Masuda (益田由美) and Yuko Jogasaki (城ヶ崎祐子) had rented a car from Oxford and were using a SatNav to navigate their way to and around the Cotswolds.
Included in the filming was their arrival at the farm, collecting eggs and feeding the pigs in the morning, and having their breakfast. They were a really fun and friendly crew and it was interesting to see the work they put into the filming, including the close up shots of the cooked breakfast, detailed inside of our sausages, etc. and the kids really enjoyed seeing the crew at work.
We kept to English for the filming, as that was the theme of the programme and Yuko speaks very good English, and she translated for Yumi and the audience. Altogether great fun.
Aside from their time at Lowerfield Farm, they filmed going to Broadway Tower, at Moreton in Marsh market on the Tuesday, horseriding, The Slaughters, Bibury and the Cotswold Cheese Company. A busy schedule.
At work filming departure
The programme is due to air early next year, and the producers promised us a DVD copy which is something to look forward to . . . I think.

Sunday, 20 November 2011

Footings in

Before and after - front of house
Before and after - site
Had a fraught couple of days to start the week, as we'd opted to do the ground clearance for the site, in order to save the plants we wanted and salvage firewood. It's also a good feeling to actually start the project off with some hard physical work on it ourselves (that old Protestant work ethic has a lot to answer for).
With just 3 scheduled days on site this last week a lot has been achieved very quickly. After the initial surveying and planning to avoid existing pipework, etc., the foundations were dug on Thursday / Friday and concrete foundations went in on Friday afternoon. It's been dry, bright and relatively warm, which allowed the schedule to proceed as planned for this weather-dependent phase.
The only real issue has been that during Friday afternoon, just before the first concrete truck arrived, the digger broke through the main pipe taking water out to the barn and animal troughs. For some reason the pipe had been laid with a dog leg from the house to the barn, so there was no way to know it was under there. Anyway, the builders very professionally worked around it, and aside from a slight change to the depth of concrete for that one corner, the only issue's been having to cart water to top up drinkers for the weekend. All should be fixed tomorrow.
Concrete foundations in - End of week 1

For the week ahead, weather permitting:
Monday the ground will be prepared for putting down the concrete floor, the bricklayers should start on Tuesday, firstly building up to the damp proof course level; the hardcore and concrete floor should then be laid; and hopefully we'll be starting the proper brickwork at the end of the week.

Saturday, 12 November 2011

Improvements to the B&B

Since October 2010 we have been planning some redevelopment of the B&B and this is finally going to get underway in the coming week. In short, we will be adding a large extension to the northeast side of the building, converting half of the stable block, and connecting the stable block to the main house (or rather re-connecting the stable block - there are marks on the farmhouse Cotswold stone walls showing that it was attached at some point in the past).


The work will be staged in order to minimise any potential disturbance to guests. We will be closing The Lynches to all but exceptional bookings from November 14, due to the fact that it would overlook the building work. Dark Coppice and The Dingle will be closed after New Year. Rooms on the south side of the house will remain open throughout, as they should be unaffected.


What will this add to the guesthouse? Well, this gives us a great opportunity to make a major upgrade to our facilities.
a) Dark Coppice and The Dingle will be enlarged by incorporating the current bathroom areas into the rooms themselves, and larger, newly equipped ensuite bathrooms with large shower cubicles will be constructed in the new build.
b) The Lynches will disappear as a guest room as a new, much larger room with dual aspect, the main one of which will be a fabulous view towards the Cotswold escarpment, will be constructed in the new build.
c) Our current dining room will be converted to a new ground floor guest room, with a new ensuite bathroom constructed between the house and stable block. This room will be equipped for ease of use by guests who are less mobile.
d) Half of our existing stable block will be converted to a new feature dining room retaining many of the original roof characteristics as exposed beams. This dining room will be much larger, able to seat all guests at one sitting, and will also incorporate a new bar area.
We will also be greatly improving our private accommodation.


These developments will take Lowerfield Farm up to 8 letting rooms, all ensuite, and 7 of which will be larger 'superior' standard rooms. With two guest rooms on the ground floor, it will also help us cater better for the many guests who prefer to have rooms avoiding stairs.
All work on the guesthouse is scheduled for completion prior to the Cheltenham Festival in early March 2012.