Walls up to mid-window level - End of week 3 |
The plan is that the extension should be enclosed (i.e. a battened roof) by the time the builders break for Christmas / New Year, but that will largely depend upon whether the weather holds. Then once the roof proper is in place and the work has moved inside, we will be altogether less dependent upon what's happening with the elements.
For the week ahead: Work will continue with raising the walls and building above window height. The arches will need to be build over the windows and doors and hopefully the joists will go on late in the week.